Appendix B

The Transpersonal Facilitation Method, Version 1.0
Pre-publication manuscript; not independently peer reviewed.

Appendix B — Codification Log

B.0 Purpose and governing notes

This appendix records how the contemporary formal architecture of TFM received its present expression during the 2026 codification, and where the surviving record stops. It is a provenance instrument, not an account of invention. [P]

GN-1 (first proposer). The 2026 codification was an AI-assisted analytical process conducted with Khalighi, in which formulations were iteratively proposed, challenged, revised, accepted, rejected, or modified (§3). The surviving codification record does not permit reliable reconstruction of the first proposer of any formulation, term, model, distinction, sequence, or wording listed in B.2 and B.3. Every such entry is therefore recorded as "not reconstructable". No entry attributes a formulation to Khalighi, to an AI tool, or to both jointly. [H-D] (AE-30)

GN-2 (AI tools, versions, chronology). The retained record does not preserve a sufficiently complete account of the AI tools' model versions and dates of use to report them reliably (§3). This appendix states no model, version, session date, or proposal chronology. The only dates given are those printed on the retained documents themselves. [P]

GN-3 (adoption). Khalighi attests that during the 2026 codification he reviewed the present TFM architecture and the constructs formalized through that process and adopted them, including the frozen V0.2 three-layer architecture as amended (FC-2 [H-T], 2026-09-19). Where a retained document records a frozen or approved status, that status is also given; none of those documents names the approver. No construct-specific adoption date is recorded. [H-T]; [H-D] for the printed statuses.

GN-4 (version sequence). The paper versions are Draft 1 → V0.1 → V0.2. The Architecture Freeze v1.0 describes the Foundational Paper as "forthcoming", placing it before V0.1. The relative order of Draft 1 and the Architecture Freeze v1.0 is not established by their contents. "First appearance" means the earliest retained codification record examined in which the construct appears. It does not mean its first occurrence in any conversation or unretained draft. [P]

GN-5 (no backward projection). A 2026 formulation that formalizes earlier teaching does not establish that the formulation existed earlier. Pre-2026 teaching is recorded only in Appendix A and §4, with its own evidence status. [P]

GN-6 (authorship). Khalighi developed and taught the underlying facilitation methodology before 2026 (§§3–4). AI-assisted analysis was used in 2026 to examine, differentiate, organize, name, and formalize structures developed from that teaching. AI functioned as a tool, not an author. Khalighi reviewed and adopted the contemporary architecture (FC-2) and retains responsibility for the paper's propositions. [P]

B.1 Retained codification records examined

Record Date printed on record Use in this appendix
Foundational Paper — Draft 1 (with Internal Critical Review V1, Core Principles & Definitions V1, Lineage & Contribution Analysis V1) None printed Draft 1 forms; superseded entries
TFM Final Methodological Position — Architecture Freeze — Version 1.0 September 2026 Frozen status; earlier forms
TFM Architecture Freeze Amendment — Three-Domain Capacity Model — Version 1.1 September 2026 Three-Domain Capacity
TFM Foundational Paper — Working Manuscript — Version 0.1 None printed V0.1 forms
V0.2 Controlled Revision Specification — Version 1.1 FINAL COMPLETE (FC-1 to FC-4)* None printed First appearance of V0.2 constructs; freeze conditions
V0.2 Implementation Register (R-18); retained codification record by founder adjudication, 2026-09-19. This does not imply that every AI conversation or transient artifact was retained. September 2026 (session record) Canonical opening/closing terms
Executed TFTP agreements (2023-05-16; 2024-09-12; 2026-05-05; 2026-09-10) As executed R2/R3 compatibility review (B-7)
Final Evidence Resolution Status v1.0; E19–E20 Final Adjudicated Report 2026-09-18; 2026-09-17 First-proposer limitation (E6); 2026-formalization classifications (CX entries, Appendix A)
The V0.2 manuscript of this paper — Current form of each construct

* The designation "FC-1 to FC-4" in this record title refers to corrections made to the specification itself. It is unrelated to the Founder Attestations FC-1 to FC-4 recorded in Appendix A.

B.2 Superseded entries

ID Representation Version history (Draft 1 → V0.1 → V0.2) First appearance Status / adoption Proposer Note
S-1 Seven-phase cycle: Orient → Attune → Design → Open → Facilitate → Integrate → Complete Draft 1 (operational method) → not carried into V0.1 (seven-domain architecture used) → V0.2: superseded by the six-phase macrostructure (B-3) Draft 1 §10 Superseded; not adopted Not reconstructable (GN-1) Draft 1 presented it as "the formal architecture". It is recorded here only as a superseded representation.
S-2 Five-step loop: Perceive → Discern → Respond → Observe → Adjust Draft 1 (Level Four, "moment-to-moment facilitation loop") → V0.1: replaced by the six-step Live Facilitation Loop → V0.2: six-step Loop retained (B-6) Draft 1 §§13, 16 Superseded; not adopted Not reconstructable (GN-1) —
S-3 Nested arcs (four levels), including the "Container Arc": Open Space → Open Practitioner → Facilitate Experience → Close Practitioner → Close Space Draft 1 → V0.2: replaced by the six phases (B-3) and the two-strand Arc (B-9) Draft 1 §16 Superseded as a structure; the opening/closing terms were later canonicalized (B-15) Not reconstructable (GN-1) Draft 1 is the earliest retained record examined that uses "Practitioner" in the opening/closing terms.
S-4 Method → Maps → Practices (three-tier distinction) Draft 1 → V0.2: carried as the architecture/repertoire distinction and the "Maps and Repertoire" subordinate model (B-16) Draft 1 §17 Superseded in form; its distinction survives in V0.2 §7 Not reconstructable (GN-1) —
S-5 Seven-domain architecture (Orientation → Design → Facilitation → Discernment → Stewardship → Epistemic Discipline → Completion) Architecture Freeze v1.0 §39 → V0.1 → V0.2: superseded by the three-layer architecture (B-2) Architecture Freeze v1.0 §39 (Sept 2026) Documented status in Freeze v1.0: "APPROVED FOR MANUSCRIPT DEVELOPMENT" (approver not named; AE-33a). Superseded in V0.2. Not reconstructable (GN-1) —
S-6 Seven-level Decision Hierarchy: Integrity/Safety → Agency/Consent → Scope/Competence → Capacity → Intention → Process → Technique Freeze v1.0 §18 → V0.1 §§6, 10 → V0.2: replaced by the two-tier Decision Framework (B-7) Architecture Freeze v1.0 §18 (Sept 2026) As S-5; superseded in V0.2 Not reconstructable (GN-1) AE-32 verified the V0.1 form.
S-7 Earlier definitions of Transformational Stewardship: Draft 1 ("a methodology of transformational stewardship") and Freeze v1.0 §5 ("the disciplined exercise of bounded facilitative authority…") Draft 1 → Freeze v1.0 → V0.1 → V0.2: replaced by the §7 definition (B-1) Draft 1 (term and thesis) Superseded by the V0.2 definition Not reconstructable (GN-1) —

B.3 Current constructs formalized during the 2026 codification

ID Construct Version history (Draft 1 → V0.1 → V0.2) First appearance Adoption (decision and date) Proposer Note
B-1 Transformational Stewardship: name, and the V0.2 definition with four propositions Draft 1 (term and thesis) → Freeze v1.0 §5 (definition) → V0.1 → V0.2 §7 (definition as Specification D.2) Term: Draft 1. Present definition: V0.2 Specification D.2, labelled there "Working Candidate (not frozen)". FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3). The Specification's freeze condition ("after E12 (Block / Kee & Newcomer primary-text check) and team approval") was satisfied on 2026-09-19: approval by FC-2, and the primary-text check in the citation audit. The definition is frozen. Not reconstructable (GN-1) No originality is claimed for the phrase (§7). The underlying orientation is attested [H-T]; the name and formulation are 2026 (CX-12).
B-2 Unified architecture: governing principle; methodological prerequisite; three layers Draft 1 (seven-phase cycle) → Freeze v1.0 and V0.1 (seven domains) → V0.2 §7 (three layers) V0.2 Controlled Revision Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) 2026 formalization (CX-01). It does not date the underlying methodology.
B-3 Six-phase macrostructure: Prepare → Design → Open → Facilitate → Integrate → Close Draft 1 (seven phases, S-1) → V0.2 V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) Phase-level historical statuses are marked in §7, Layer 1.
B-4 Six continuous functions (Attunement; Differentiation; Capacity Monitoring; Agency/Consent Maintenance; Proportional Intervention; Container-Support Coordination) V0.2 V0.2 Specification / V0.2 §7 FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) Component ideas (least necessary intervention, attunement, 80/20) appear in Freeze v1.0. The function set is a V0.2 formulation.
B-5 Standing commitments: Governing Constraints (Safety/Integrity; Agency/Consent; Scope/Competence; Capacity); Bounded Authority; Epistemic Restraint; Service Orientation / Hollow Bone Freeze v1.0 (bounded facilitative authority; epistemic restraint; Hollow Bone) → V0.1 → V0.2 (grouped as Layer 3) Grouping and "Governing Constraints": V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) Hollow Bone is inherited (§6); only its formation function is a TFM adaptation.
B-6 Live Facilitation Loop: Perceive → Differentiate → Prioritize → Choose → Observe → Adapt Draft 1 (S-2) → Freeze v1.0 §19 → V0.1 → V0.2 §10 Architecture Freeze v1.0 §19 (Sept 2026) FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) The six-step form is 2026 (CX-03). Adaptive pivot is documented by Sept 2024 (AE-18); recursive tracking is attested.
B-7 Decision Framework: Tier 1 Governing Constraints; Tier 2 Action Priorities (Intention → Process → Technique); rules and proportionality Freeze v1.0 and V0.1 (seven-level hierarchy, S-6) → V0.2 §11 V0.2 Specification E.1–E.2 FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3). The Specification marked R1, R4 and proportionality "Freeze". R2/R3 compatibility condition CLOSED: "Compatibility reviewed September 19, 2026. No conflict identified in the retained ethics and safeguarding documents. R2 is supported in part by documentary evidence: participants may discontinue activities when reasonably necessary for safety, and EM may modify, restrict, suspend, or decline participation in particular activities for safety. R3 is supported as to emergency assistance without contemporaneous consent and prospective consent to emergency medical care. The least-restrictive-action and documentation elements remain contemporary TFM propositions rather than historically documented provisions." Not reconstructable (GN-1) CX-02. The adaptive logic is attested [H-T]. R2 and R3 remain [P] propositions; the compatibility finding does not make them historical claims.
B-8 Three-Domain Capacity (Participant, Facilitator, Container); relational Container Capacity Freeze v1.0 §20 (facilitator and participant capacity) → Amendment v1.1 → V0.1 → V0.2 §11 Architecture Freeze Amendment v1.1 (Sept 2026) Documented status: "Approved Architectural Amendment" (Sept 2026; approver not named); FC-2 [H-T] Not reconstructable (GN-1) CX-04 to CX-06. The Amendment itself disclaims pre-2026 existence.
B-9 Arc of Experience as a two-strand model (container strand; experiential strand) with function assignments Draft 1 (nested arcs, S-3) → Freeze v1.0 §13 → V0.1 → V0.2 §9 Two-strand form: V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) The term "Arc" is documented in teaching by July 2023 (AE-13); the formal model is 2026 (CX-10).
B-10 Intention-led design sequence (Intention → functions and qualities → candidate practices → Practice Set → Arc) Draft 1 (practice-design logic) → Freeze v1.0 §12 → V0.1 → V0.2 §9 Draft 1 §10.3 (earlier form) FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) The Practice Set term is documented in teaching by October 2023 (AE-14). The full sequence is a 2026 formalization (§7 table).
B-11 Facilitator Formation Model; formation as a methodological prerequisite, not a phase Draft 1 §8 (facilitator formation) → Freeze v1.0 §8 → V0.1 → V0.2 §8 "Formation Model" and "Methodological Prerequisite": V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) The developmental premise is attested from 2022 (FC-3 [H-T]).
B-12 Fidelity Criteria and 15-element Fidelity Chain Internal Critical Review V1 (fidelity criteria named as a need) → Freeze v1.0 §§33–34 (positive and negative fidelity tests) → Amendment §8 → V0.2 §14 Chain as such: V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) CX-11. The E19–E20 report records "sixteen-element"; this is an adjudicated counting error, and 15 governs.
B-13 Process authority vs meaning authority (bounded authority) Draft 1 ("symbolic literacy without symbolic authority") → Freeze v1.0 §6 ("strong process authority does not confer unlimited interpretive authority") → V0.2 §11 ("meaning authority") "Meaning authority" as a term: V0.2 Specification FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) CX-07. Participant ownership of meaning is attested (AE-26).
B-14 Epistemic restraint: Perception ≠ Interpretation ≠ Meaning ≠ Fact; seven claim types Draft 1 (energetic literacy with epistemic humility) → Internal Critical Review V1 §VI (seven levels of knowing proposed) → Freeze v1.0 §§23, 39 (formula) → V0.1 → V0.2 §5 Seven claim types: Internal Critical Review V1 §VI (as proposed "levels of knowing"). Formula: Architecture Freeze v1.0 §39. FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) CX-08 (narrowed). The claim-type classification is a V0.2 formulation.
B-15 Canonical opening and closing terms: Open the Space; Open the Practitioner; Close Practitioner; Close the Space Draft 1 ("Open Space … Close Practitioner … Close Space") → V0.2 drafts ("people" forms) → V0.2 canonical terms Draft 1 §12 and §16 (the "Practitioner" usage) Canonical form adopted by founder decision recorded in the V0.2 Implementation Register (R-18), September 2026. Historical "people/space" wording preserved (AMB-4, AMB-5). Not reconstructable (GN-1) for the terms; the canonicalization decision is the founder's, as recorded The people-before-space order is documented July 2022 (AE-09). The canonical terms are not projected onto that source.
B-16 Maps and Repertoire as a subordinate model, including the Five Instruments Draft 1 (Method → Maps → Practices; Five Instruments) → Freeze v1.0 §14 → V0.1 → V0.2 §§7, 9 Draft 1 §§11, 17 FC-2 [H-T]; no construct-specific adoption date is recorded (GN-3) Not reconstructable (GN-1) The Five Instruments name is pre-2026 teaching (see B.4); membership is attested.

B.4 Pre-2026 teaching terms carried into the architecture (not 2026 formulations)

These names were in use in Khalighi's teaching, or inherited, before the codification. They are listed so that they are not mistaken for codification proposals. Their provenance is governed by Appendix A and §6, not by this log. [P]

Term Pre-2026 status (Appendix A) Note
Five Instruments (name) Taught by Khalighi; documented in live teaching by July 2023 (AE-12) Membership attested [H-T]. Influence from Meghan Makena/AMBA attested; no claim that she originated the grouping (E7). Not a 2026 proposal.
Intentional Alignment Inherited through Sue Holmes (attested); documented in 2022 curricular material (AE-08) Adaptation into group design is a candidate TFM contribution (§6). Not a 2026 proposal.
Hollow Bone Inherited (attested via Sue Holmes; older precedent acknowledged, §6); taught with facilitator integrity by December 2023 (AE-16) The formulation "receptivity without abdication" is a codification formulation; first proposer not reconstructable.
Practice Set Taught by October 2023 (AE-14) Term pre-2026; the mature design sequence is 2026 (B-10).
Arc of the Experience Taught by July 2023 (AE-13); teaching of the progression as an "arc" is founder-attested (§16) Formal two-strand model is 2026 (B-9).
Sentries (support roles) 2022 curricular material (AE-10); 2023 and 2025 teaching (AE-15, AE-20) "Centuries" is a metadata/caption error.
80/20 orientation Attested: learned from Sue Holmes, adapted to group work by Khalighi Heuristic, not a measurement.

B.5 R2/R3 compatibility review record

Clause Source and location Verified text Checker / date
†1(a) 2026-09-10 agreement, Section I §7 "Participant agrees to notify a facilitator when Participant experiences significant physical or psychological distress during an Official Program Activity and to discontinue an activity when reasonably necessary for safety." Amir Khalighi, 2026-09-19
†1(b) Same, §7 "EM may modify, restrict, suspend, or decline Participant's participation in particular activities when EM reasonably determines that doing so is appropriate for safety." Amir Khalighi, 2026-09-19
†2 Same, Section I §8 "If Participant becomes injured, ill, incapacitated, or otherwise appears to require urgent assistance during an in-person Official Program Activity, Participant authorizes EM personnel to contact emergency services and seek reasonable emergency assistance on Participant's behalf when circumstances make it impracticable to obtain Participant's consent." Amir Khalighi, 2026-09-19
†3 2023-05-16 agreement, clause 8 "(b) if medical care is rendered to me, I consent to that care if I am unable to give my consent for any reason at the time the care is rendered." Amir Khalighi, 2026-09-19
Also relied on (verified earlier) 2026-09-10 §§22, 24; 2026-05-05 Ethics Addendum §5 Decline, pause, modify, withdraw; consent before physical contact and interpersonal exercises Appendix A, A.4 (AE-23; AE-24), 2026-09-19

The review found no conflict between the Decision Framework's rules R2 and R3 and the retained ethics and safeguarding documents. R2 and R3 remain propositions of the paper [P]; the documents support them in part. [P]

B.6 Scope of this log

  • Establishes: the version path and earliest retained appearance of each construct; the printed frozen or approved statuses; Khalighi's adoption (FC-2 [H-T]); which terms are pre-2026 teaching and which are 2026 formalizations; the R2/R3 compatibility review.

  • Does not establish: any first proposer (all "not reconstructable"); AI models, versions, session dates, or proposal chronology (§3); construct-specific adoption dates; the relative order of Draft 1 and the Architecture Freeze v1.0; pre-2026 existence of any 2026 formulation; originality.